The project involves decommissioning and disposal of a clinical waste incinerator with an internal furnace capacity of about 1 cu . m . and the entire incinerator flue pipe from the sub - lower ground floor up to the 7th floor and above the roof of tang shiu kin hospital 工程包括清拆及处理位于邓肇坚医院的医疗废物焚化炉(其容量为1立方米)及整个烟道(由下层至七楼向上伸展至医院大楼顶部之上) 。